• Onshore And Offshore Gas Terminals
  • Oil Storage Facilities
  • Oil Exploration Plants
  • Piping Lines

Northern Cyprus Water Supply Project: The project is beginning from Anamur (City, located in south of Turkey) and ending in Northern Cyprus. The pipeline distance is 80 km and is located under 250 m depth in Mediterrnean. Berdan Cıvata supplied Bercrome® coated flange studbolts of the pipeline to the project. (Bercrome®: has resistance to 6500 hours salt sprey test. This test means products have nearly 150 years corrosion resistance. And this coating type is patented by Berdan.)


Trans Anatolian Natural Gas Pipeline Project (TANAP): 1.850 kms part of this pipeline Project passes through Turkey. Berdan Cıvata supplied Teflon coated flange studbolts, bolts and nuts to the project. (Teflon coating: has resistance to 2400 hours salt sprey test. And, only Berdan Cıvata is able to make this coating in Turkey.)

Documents
Dear project owners, it is important where you bought bolt. You can buy the bolts of this crane.
Same brick, same concrete.. Why do you think that only this building is survived?